Sharepoint Part 5: Custom Project Systems on a Shoestring

Develop your own project systems using Free Tools, just add labor


So far, we have collected the requirements, created the high level design, implemented most of our custom lists, and designed the process workflows, including structures in the lists to support the state-based workflows. Now we are ready to implement the workflows.


Implementing Custom Workflows with Sharepoint Designer
First, if you don't already have it, you need to download and install Microsoft Office Sharepoint Designer (2007). After you have it installed, launch it and open your Sharepoint site URL (i.e. http://mysharepointsite.com). You will need to login with a user account that has Site Collection owner privileges. (If you don't, the workflow will not have privleges to run once it is loaded). The will bring up your website structure in Sharepoint designer. 
Note: Although there are many things you can do with Sharepoint Designer, we are going to focus only on the Workflow design aspects of it here.


Creating your first Workflow - New List Item
From the File menu, Click on New > Workflow. This will bring up the New Workflow dialog.
You will need to name your workflow. Try to choose well, as although you can rename it later, there can still be references to the old name tucked away. For this exercise, we will call it "New Project".
Next, choose the list you want to build the workflow for. You cannot change this later. We will use the Projects list we created in Part 3.
By default, new workflows are set to be manually initiated. This is helpful when you want to test a new workflow without having it run automatically until you are sure it is working properly. We'll leave it like this for now; we will go back and change it later.
Click on the "Next" button. You will now see the workflow step designer.
Name the step to be something meaningful. You can change this name at any time, and you can re-order steps if needed for your business logic. Note that each step is independent, that is, you can have many steps in a workflow, but each step will execute in sequence. You cannot, for example, skip directly from Step 2 to Step 7. However you can code your steps to only take action if/as appropriate, based on what has happened in the preceding steps. So you can code steps 3,4,5 and 6 to take no action under specific circumstances.

Each step consists of one or more Condition blocks, followed by one or more Actions in each Condition block. You can have many condition blocks in each step, structured as 

IF <condition block A evaluates to True>
THEN <action block A>
ELSE
IF  <condition block B evaluates to True>
THEN <action block B>
ELSE ...etc


Note that if you always want the actions to happen, then you can have an empty condition block. This is usually the only condition block in the step (no IF THEN ELSE). Condition blocks are structured as sets of AND/OR logical evaluations, i.e. evaluate to TRUE IF a AND b AND c AND d ...etc conditions are true. (Similarly with OR).


Tip: I would recommend sticking with only one type of logical operator in each Condition block (AND, or OR) and not mixing up AND/OR evaluations in the same condition block. It can become confusing, as it may not be clear to you what the precedence order of the evaluation will be. So the easiest thing is to avoid it, and model your logic in discrete steps instead, with grouped AND conditions, grouped OR conditions, etc.


Adding the Actions
You can then add one or more actions to take place for the condition in this step. You can update items in this list, update items in another list based on values in this list (if they are linked, as we did in Part 4), and many other functions. You can also store intermediate results in variables and use them for later business logic decisions, or to update list fields in this step or in later steps.
Note: There are a number of built-in actions in Sharepoint Designer; however you may soon find them somewhat limited as I did, but you can download a number of free additional action packs from iLoveSharePoint on the Codeplex site when you begin developing more complex workflows. Ones that I recommend downloading and installing are iLoveSharepoint.DesignerActions (follow the instructions for the package in Codeplex for installation instructions):



  • Start a Workflow
  • Do calculation
  • Execute SQL
  • Get Parent Folder 
  • Other XML and string functions


Auto-numbering the List Item
For this exercise, we are going to Autonumber the list item when it is created (with our own numbering scheme), and include that number in the Title of the list item, so that it is unique, identifiable and sorts properly. We will also store the number in a hidden field in case it is needed later.


Previously, we created the Autonumber list, with the Title field, LastNumber field and a calculated field called NextNumber, which is [LastNumber]+1. The Title field names the list we are numbering.
Tip: When you first setup the list, you need to set the initial number for the list; I suggest using a high number to keep sorting simple, i.e. 10000, 100000 or higher, depending on how many items you expect to add in the lifetime of Sharepoint use, before rolling to the next higher order of digits. (i.e. if you numbered starting at 100, you could quickly roll through 999 and then on to 1000 which would mess up your text-based sort order, as you will see later on).


In our autonumber Workflow step, the Condition block will be blank (true always), and the Action block will contain the steps necessary to:

  • Read the latest number from the AutoNumber list for the "PROJECTS" record
  • Set the AutoNumber list "PROJECTS" record LastNumber to the number used
  • Assign it to the Project record
  • Update the Project record Title to include [<number>] + Title text

The workflow step Action block will end up looking like this, which we will step through:
1a) We will create a variable (called mNumber). Select "Set Workflow Variable" from the list of actions. Specify the type as Number.
1b) We will set it to the NextNumber field from the AutoNumber list, as follows, by choosing the list to lookup, and the field to pull from, where the field "Title" in the Autonumber list is "PROJECT":
2) We then set the number field (in this case, [Fwk #]) in this new Project record to the variable mNumber, using the "Set Field in Current Item" action.
3) We then update the Autonumber list ("PROJECT" record), setting the LastNumber field to the mNumber variable. Add an "Update List Item" action and complete it as follows:
4a,b) Next we will add the number to the title of the Project. We will use the Title from the current record, and prefix it by building a dynamic string using the "Build Dynamic String" action, which outputs to the mTitle text variable:
5) Finally, we store the new prefixed title, by using either the "Set Field in Current Item" or "Update List Item" action. Tip: If you want to update more than one field at a time, use "Update List Item".
Now, we save the workflow by clicking on Finish, which will make it available (and visible) in Sharepoint. You can test it first by manually initiating the workflow from a list item. 
When you are satisfied the workflow is functioning properly, go back into Sharepoint Designer, choose File > Open Workflow, choose the workflow name, and then change the start conditions from "manual" mode to "Automatically start this workflow when a new item is created".


Done! 


The next workflow: Updated List Item
In this section, we will look at the logical framework for state-transition based workflow actions (i.e. change in value of fields from a previous to new value). These can be used at different levels, i.e. detect if there is a change, and if so, take specific actions, but if the transition was from A to C then behave differently than any other transition to C, etc.


Add a new Workflow, named appropriately, i.e. "<Listname> Updated". Start with it as a Manual workflow, but when you have finished testing, go back and change the trigger conditions for the workflow to be "Automatically start this workflow whenever an item is changed".


Take action based on change in Field Values
For this example, will look at the case of a Project changing status (from any prior status) to "[1] Estimating".
In this workflow step, a new Task Assignment record will be created, as long as this was a change in status:
This uses two "Compare <Listname> Field" comparisons, which can be compared to other fields in the same list, to a literal text value, or to another data source (another list, or workflow variable).


For this test, IF the prior status not the same as the current (new) status, AND the new status is "[1] Estimating" THEN the action(s) will be triggered.


The Actions
Using the same type of lookup into the Task Assignment Types setup list, above, we store the TaskType key into a variable, mTaskType for the "Estimating" task type:
Next, we will Create new list item in the Project Assignment list. We will assign values to all required fields in the Project Assignment, including the link back to the Project, the customer, other key fields and common filter fields like client ref#, customer ref#, etc.
Additional actions may be included as well, depending on your design.


The Final Step - Setting Prior Values

It is very important to make sure that you have a step at the end of the workflow that sets the "prior" values to the "current" values - for any fields that you have defined Priorxxxx fields for. This will make sure that any updates to the record during the workflow execution will not trigger an infinite loop of calling the workflow over and over again.

You will need a "blank condition" step like the following, at the very end of the workflow:
You can use the action "Set Field in Current Item" or "Update List Item", if you have more than one Prior field to update:


Breaking the Infinite Loop

As above, every step in this workflow will only cause an action when the Prior value is different from the Current value being compared. That way, if the workflow actions cause an update to the record, it will only run once more (doing nothing) then stop. 


It is also imperative that the workflow does not update any of the fields it is using to test, i.e. Status. This could also cause an infinite loop. Keep the logic clean and separated. Design it so that an "external event" (i.e. user updating the status, or project assignment completion updates the status in the Project record) is the only way those "prior/current" comparison fields are ever updated. And also ensure that you design the workflows so that updates in List A which trigger updates in List B do not cause Prior/Current field changes in List A, etc.


Next time, we will look at advanced workflow actions, using Windows PowerShell (2.0), as well as outside-of-Sharepoint batch scripting, using the .NET extensions for Sharepoint.


Coming next:
Part 6: Advanced Workflows with PowerShell
Part 7: Hosting tips, Email & Notifications
Part 8: Doing it Yourself - Recommendations
Part 9: Using what you've built - more free enhancements


Go back to:
Part 1: The Need
Part 2: Designing the Solution
Part 3: Building the Structure - Sharepoint Lists
Part 4: Process Workflow Design


For more information or questions, contact:


Gary Nelson, PMP
www.gazzaconsulting.com

Sunday, October 2, 2011

Sharepoint Part 4: Custom Project Systems on a Shoestring

Develop your own project systems using Free Tools, just add labor


In the previous sessions, we have (1) identified the needs & requirements for a custom Project System, (2) developed the high level design of objects and workflows, and then (3) implemented the lists [tables] and the basic relationships [lookups/keys] between them.


Process Workflow Design
In this session, we will cover the approach to detailed design of the process workflow, prior to implementing/coding it in Part 5. It is important to understand the process model and use it as a reference as you move forward, as some workflows can be quite complex when you get into the implementation. 


Note: The development tool that will be used is Microsoft Office Sharepoint Designer 2007, which is free and works with Windows Sharepoint Services (WSS) 3.0 (free) and Microsoft Office Sharepoint Services (MOSS) 2007 ($). Newer tools may apply  for Sharepoint 2010 development, but the principles will be the same.


Key Objects
In our system, although there are many lists defined, there are really two main lists that drive most of the activity, and are of central importance to running a project-based business, or groups of projects in a program, etc.


The Project
Projects are the anchor object for any given project (or deliverable, if your projects business handles high volume small deliverable-based projects). The Project will be created and maintained by the Project Manager/Coordinator. Projects will go through many different stages and status values (lookup list) throughout the lifecycle of the project. 


A key element in our workflow model is the use of status changes to trigger events, and many of these events will create items in other lists, including:

  • Create New Project Assignments
  • Update open Project Assignments tied to the project
  • Add entry to Audit Log
  • Add entry to Project Notes Log
  • Trigger billing event on Fixed Price deliverables
  • etc

Project Assignment
The project assignment is essentially a work package under the project, where one individual [or team] is responsible for delivering that component of work/service/deliverable. Project Assignments are also status-based, and workflow activities will occur based on a number of conditions when an Assignment is updated, including:

  • Project Status change on Assignment completion
  • Time entry
  • Held Time entry added if case of T&M overage
  • Notes recorded
  • etc
The Project Assignment will also be the "one stop shop" for status updates, time entry, note logging, etc for the person assigned to the activity. The Project Assignment Update workflow will automatically update information in the main project record. Depending on the status of the project at the time, different project fields will be updated based on the correct context.


Note that the Project Assignment Update workflow will also be designed to only update Project Status if the project is STILL in the same status when the Assignment was created. This helps prevent stale assignments changing state inappropriately, in case the Project Manager later needed to change the Project status manually because the team member had not closed out their assignment in a timely fashion, but the work had been completed.


Workflow Design - revisited
In Part 2 we identified the high level workflow design, in terms of state transitions on projects and what the next steps were. We will focus on one of the workflow state diagrams for our discussion. You can refer back to Part 2 for the full set of workflow diagrams as we do not repeat all of them here in this session.
In the diagram, bright green indicates when a Project Assignment needs to be created. Customer activity states are in light yellow. From our perspective, as the vendor, these indicate no current action required on our part other than monitoring vs the schedule. The customer is responsible for completing that task.


Projects have 6 distinct stages:

0 – New
1 – Requirements / Estimating [Project Initiation]
2 – Development / Delivering Service [Project Execution]
3 – Customer Testing / Revision Cycle [Project Execution]
4 – Complete to Billing (Accepted) [Project Closeout]
5 - Warranty

In order to help keep track of the activity within stages, the Project Status List values include the project stage as the first part of the name, i.e. [1] Requirements Review. Some stages will need to have similar status values (i.e. Testing), and as we are going to be designing our workflows to make decisions on the change in status values, we need to have distinct status codes by stage. This also helps avoid confusion and actually simplifies the workflow implementation. The list also includes additional fields describing the stage it applies to, and information for both workflow and documentation purposes.


Phase 1 Workflows: Project Initiation

We will use the Project Initiation stage[1] for our example. 


Each oval (except the blue one) indicates a specific project status. Transitioning to another status may trigger creation of a new Project Assignment (bright green), or another state, indicating either the customer has an activity (whose hours we do not track), or, in Phase 1, projects may be abandoned or estimates rejected by a customer.


Note that when a customer responds, the Project Manager will then set the appropriate status in the Project to trigger then next round of workflow activity within the team.


In the first stage of the Project lifecycle, every project starts out with a status of [0] New. This corresponds to the New Project workflow, where initial setup of the project, including numbering, setting prior values etc takes place. All of the business logic workflow transitions occur inside the "Updated Project" workflow, so we do not want to replicate that logic in the New Project workflow.


After the Project is created, then the appropriate status is set depending what is needed - estimating, writing requirements, delivering service, etc.


Other Types of Project Workflow Activity
  • On any change of status (or new value from prior value), the Project Audit Log will always be updated to include the change. 
  • Depending on the status transition, a new Project Assignment may be created
  • Email can be sent to the Project Manager and Project task owners on change of Project status
  • Depending on the type of project and the new status, a standard folder structure may be automatically created in the Deliverable Repository, for storing project documents and deliverables in a consistent fashion [Part 6, PowerShell]
  • When ownership of a task type in the project changes, the audit log will be updated and any open Project Assignments will be updated to move the assignments to the new person's queue. [Part 6, PowerShell]
  • Any other type of supplementary activities you need to happen when records are updated.

Workflow Design Concepts
There are some key design concepts to keep in mind when you are building Sharepoint workflows, that are a bit different than coding in other languages/tools. This is at least true of the Sharepoint Designer tool itself, as it enforces a specific approach to coding the workflows that you need to work within. Note that in Part 6, we will be able to do advanced workflow coding using PowerShell - launching out from the basic Workflow structure in Sharepoint Designer.
In Sharepoint Designer:
  1. Workflows are triggered by events:
    1. New list item
    2. Updated list item
    3. Manually triggered
  2. Each step in a SD workflow is independent. Step 1 will execute, then 2,3,4,5 etc. There is no programmatical method of branching or skipping of steps. 
  3. However, you can terminate the workflow part-way through. But do so with caution, as you will see below.
  4. Each workflow step can cause an action based on IF-THEN-ELSE type logic.
  5. You need to design in your own state change detection logic. 
  6. You need to avoid infinite loops! Workflow triggers based on "update" will continue to fire if your update triggers an update of the same record, and so on, unless you build in proper checks.

Initially, the step-by-step model can be frustrating, but it does help to keep the logic compartmentalized. It also means that when you do need to accommodate complex logic in your workflows, you need to break things up and use variables to track the results of tests/decisions from one step of the workflow to the next.


Key Design Considerations
Numbering
In our Project System, we want to make sure that key lists are numbered. Names can change, but as long as numbers remain unique, they can be very useful for communication within a project environment. Every project will need to have a unique number, and for completeness, every Project Assignment will have one too.


The numbering must be automatic, and it must be unique. We don't want to rely on anyone looking up numbers, plugging them in by hand. And why should we, when we can get the system to do it for us? So we will incorporate this into the "New Project" and "New Project Assignment" workflows when we build them in Part 5. But to prepare for this, we will need to build another custom list, to simply keep track of autonumbering of different lists. We will call this list "Autonumber" and it will contain 3 key fields:
Title: The name of the list being numbered
LastNumber: Last recorded number used in that list
NextNumber: Calculated simply as [LastNumber] + 1, which will be the next number used when we add to the list.


The New <List Item> Workflow will include logic to use the "next" number and then set the "last" number to the number being used. We will show how to code this workflow in Part 5.


Detecting Changes
Sharepoint does not provide built-in functionality for detecting changes of fields (other than simply that the record has been updated). Well, technically it does, but not in a way that is helpful to us when developing workflows. In particular, we want to be able to know if the workflow was triggered because status changed, an owner changed, or whether someone just added a line in a text box. And quite often we want to know when status changed from a specific value to another specific value, to maintain the integrity of the workflow.


The simple way to make sure you can do this, of course, is to build it in yourself. For any field that you want to be able to detect changes on, you will in fact need two fields, i.e. Status and PriorStatus. Both need to be of the same type, and you must make sure that the workflows update these properly. (This is why "Stop workflow" should not be used on key list Update workflows).


The basic design is this. For any given pair of fields, (Status, PriorStatus, or Owner, PriorOwner, etc), you need to ensure that the following always happens in the workflows:


New <List Item> workflow:
Save the main field to the Prior field, i.e. save "Status" into the "PriorStatus" field.


Updated <List Item> workflow:
Test if Status <> PriorStatus, if so then set a variable to indicate Status change
...
If Status changed then do some action or actions.
...
other workflow steps
...
At the END:

Save the main field to the Prior field, i.e. save "Status" into the "PriorStatus" field.
<repeat for any other Prior values>


Hiding columns
Ok, so now you have pairs of fields for everything you want to track changes on. You have "Field" and "PriorField" columns littering up your list. Ugly. And moreover, the "Prior" fields are all supposed to be maintained by the workflows, so you need to be able to hide them so they are not accidentally edited, right? Well the good news is that is what we are going to do next.


In your List (using an account with suitable privileges), go into the List Settings.
Under General Settings, click on Advanced Settings
At the top of the next screen, you will see a section called "Content Types". On the right side there are two radio buttons.
Choose "Yes", then click on "OK" to go back to the List Settings. You will now see a new section called "Content Types".

Click on "Item". This will bring up a screen with of all of the fields in the list. 
For each of the "PriorXXX" fields, click on the name of the field and do the following in the next screen: 
In the section "Column Settings", click on "Hidden". This will prevent the field from being visible in Edit forms, so you cannot accidentally edit it. It will also not show up in View pages. However, you can still elect to show them in custom Views if you want to.


Summary
There are many considerations in designing your workflows, what needs to be updated and when, who needs to be emailed, what needs to be created, etc. We have also set the groundwork for designing workflows based on change detection of values from prior values, which will be essential to our complex workflow development and avoiding infinite loops.


Your particular needs will likely differ from ours, however the above should cover the essentials of what you need to think about, and how the schema can be customized to support various types of workflow decisions. In the next section we will choose several of the workflows and go through step-by-step how to implement them using Sharepoint Designer.


Coming next:
Part 5: Implementing Custom Workflows with Sharepoint Designer
Part 6: Advanced Workflows with PowerShell
Part 7: Hosting tips, Email & Notifications
Part 8: Doing it Yourself - Recommendations
Part 9: Using what you've built - more free enhancements


Go back to:
Part 1: The Need
Part 2: Designing the Solution
Part 3: Building the Structure - Sharepoint Lists


For more information or questions, contact:


Gary Nelson, PMP
www.gazzaconsulting.com

Thursday, September 29, 2011

Sharepoint Part 3: Custom Project Systems on a Shoestring

Develop your own project systems using Free Tools, just add labor


Building the Structure: Sharepoint Lists
Many consider Sharepoint Lists to be just that - simple lists. In fact many use Sharepoint as a place to file documents in a central location, and only do the basics with the List functionality because it seems to be limited.


At first glance, it does look unimpressive, with the default To-Do list and a few others. However the power of Sharepoint is that in reality the whole system is a database, and every List is actually a Database Table. And as a platform, Sharepoint provides many features for working effectively with the data in these lists (sorting, filtering, views, search). 


But what can you do with a table? Not much, on it's own - but when you realize that you can add custom fields that are lookups into other lists, what you now have is the basis for defining your own database schema in Sharepoint, using multiple inter-related lists. And once you add custom workflows, the possibilities are endless.


In the last segment, we identified several key information types that we wanted to track.
As we start to build our structure, the first thing we need to do is create each of our main lists. You will need a Site Administrator type account for this.


Near the top right of your screen in Sharepoint, you will see a blue "Site Actions" button. Click on "Site Settings". You will then see the following screen:
Under Site Administration, click on "Site Libraries and Lists"
On the next screen, click "Create New Content".
In the Create screen, you will see a section titled "Custom Lists"
Click on "Custom List". You will then see the following page:
Type in the name of the list, a description if you like, and click Create.
You will now have a simple list, with a few basic fields. You will next want to add custom fields to your list, representing what you want to record. See below for instructions on adding custom fields.


Note:
There are actually more lists that will be added as we work through, such as lists that contain status codes and additional information about processing those status codes. 


However for simplicity, we will stick with the main lists above for this discussion as the principles are the same.


Tip: You can define Choose values as field types, but these should be limited - it is preferable to define additional Lists for supporting multiple value drop-downs, as they are then more easily extended. Also, if you need to change the names, you would have to script mass-assign updates if you had used a Choose field, where with a Lookup into a supporting list, the change is only made once.

Where it all begins - the "Root" List
 The key object, or List, in our system is the Project. Once all of the main list objects have been created, we can begin to link them together by adding custom Lookup fields, named logicially to describe the list being linked to:
We join lists by adding a Lookup field under the List Settings. Open the list you want to add fields to (with an account with suitable permissions to manage the lists). Select Settings>List Settings.
As you scroll down the List settings page, you will see a section called Columns. At the bottom of the list of current fields you will have the option to "Create Column".
Next, you will see the Create Column screen. Specify a name for the column that refers to the list you are linking to - ideally, a column with the same name as the other list. Choose "Lookup" as the type, and then choose the list you want to link to.
Tip: Add a description as well.
From the other list, you will need to specify the field you are linking to. By default, the primary "key" field is already shown by default.
Now the lists are linked. If you need to link back from the other list to this one, add corresponding fields in the other list, pointing to this one. 


Note: Until you have your workflows created, all additions and linking will be done manually. In particular, you only want to define "doubly linked" lists when one of those list items will be created automatically, as then the workflows can maintain the linkages in both directions for you.


Lather, Rinse, Repeat - Adding the other linkages
At this point, you should define all of the linkages from each "key" list to the other lists as defined in your linkage diagrams. We showed the linkage for the main Project list, above, but the other lists also have relationships to other lists, including back to the main Project record. Keep in mind that we already have plans to use Workflows to help maintain the linkages between lists, so don't be overly concerned yet about all of the cross relationships.


Here are the other relationships that need to be defined between the other lists. In each case the "root" list of the diagram is on the top, in yellow.

Project Assignment
The Project Assignment will be the main point of contact for each team member. It will contain information about the assignment, status, due dates, and fields for updating estimated completion dates in the main project record, actual completion dates, journal notes, etc. This is also the point of entry for time on the project, consisting of the hours worked on the specific assignment (to date, or at completion if a short task), billing notes and effective date for the time entry.


Customer Record
The customer record is used in every project (projects are for customers, after all), and also contains relevant contact information, server information, attachments etc.


Project Manager
The Project Manager in this instance is associated with a particular customer. (i.e. the customer's project manager, not ours).
 


Calendar
Every system needs a calendar, and in this case, it will be used for manual entries like vacation, as well as automatic addition of consulting or training assignments, for visibility to the team.

Time & Notes Log
This list records all time entry (billable or not) as well as any journal notes associated with a project or assignment.



Transaction Log
The Transaction Log records all key changes of information:
  • Status
  • Ownership
  • Estimated hours
  • Creation of assignments
  • any other information you feel it is relevant to capture and keep for historical/audit purposes.

Billing Events
This list will be populated automatically by T&M time entry events, or project completion for Fixed Price work. This will be reviewed and used for invoicing; it contains relevant fields for matching invoices to work billed, and "processed" flag.



Risk Events
In our model, we want to track overages, and on Fixed Price projects with a "risk buffer", we want to administer approving tapping the "risk buffer" for paying out overages to team members (within the overall project limit).
 


Held Time
For T&M work, it is important to never over-bill. So the system will keep track of the invoice limits on each work item, based on the estimate. For certain types of T&M work, the hours are partitioned within the project with sub-limits, so that if multiple resources have specific tasks on a project, one cannot "take" hours from another team member. If any time is recorded in excess of the specific limit, it becomes "Held" for later review. 
In addition, in the initial stages of a project, pre-PO, hours can be tracked prior to having a billing vehicle in place, so they can be addressed when (and if) the project gets the go-ahead.



Step Payments
For larger Fixed-Price projects, step payments may be built-in based on event thresholds. This provides the ability to break the overall project up into smaller fixed billing chunks, which can be invoiced separately when those events occur.
 

Deliverables Repository
All work output will be stored here. During the creation of the advanced workflows, automatic creation of a fixed folder structure in the Repository (triggered by project state) was developed.



All Done! 
Next time we will look at designing the workflows required to manage and maintain the data in the lists, as a status-based workflow model. Implementing the actual workflows begins in Part 5.


Coming next:
Part 4: Process Workflow Design
Part 5: Implementing Custom Workflows with Sharepoint Designer
Part 6: Advanced Workflows with PowerShell
Part 7: Hosting tips, Email & Notifications
Part 8: Doing it Yourself - Recommendations
Part 9: Using what you've built - more free enhancements